Monday, August 5, 2019

CG using wood products

Only another 15 to go.
Cardboard and balsa CG with modified US 3-rail bogies.


More detailed descriptions of this and other projects will appear on my Facebook page "Bob's Australian O Gauge Group"

Sunday, May 12, 2019

Fast electric parcel van

This was a recent build from styrene.
Finescale wheels, 1833 type motor, no gearbox.

cheers
Bob

Wednesday, September 12, 2018

19 class

Hi, I recently finished the scratchbuilt 19 class.
Here are a couple of shots.
Not based on any 19 , just things that I like.
Decals by Teditor to finish it off.


cheers
 Bob

Monday, January 8, 2018

42's in multiple

The two 42's have been basically finished.







cheers
 Bob

Saturday, November 11, 2017

A British Visitor

Today a visitor in the form of Rohan's new A3 4472 from the UK

The first hour was spent sorting out shorts between the wheels,brakes and siderods.
Then finding a stoneage controller to run it as I was afraid it had a coreless motor.
Then next was spent trying to persuade the rigid 4 wheel tender to go around 6'  radius curves :>)
But at least he got to see it run. :>)
cheers
 Bob

Saturday, April 1, 2017

back to the future indoors

Well, after some time running trains inside I came to the conclusion that for O gauge the room really was very limiting and to be honest I have never been a fan of having trains loop around behind me. I much prefer the punter's view at an exhibition.
So after another dice with an O gauge shunting idea I reverted to a central loop idea.
Once again I could have gone to S scale but thoughts of having to scratchbuild in two scales didn't appeal at this moment so it had to be go find what HO was still lying about.

Here is the result with temporary scenic items scattered about.





It is, just a means of replicating inside,  the train watching I do outdoors when the conditions are not suitable.

Much more can be found on my threads on Freerails.

regards
 Bob

Wednesday, September 21, 2016

Indoors Too

The opportunity arose to finally have my indoor layout room again.
It started as HO (too small these days), would have been best in S but that would have entailed another scale to scratchbuild it all in.
So with 3' radius at our disposal and plenty of small engines and 4 wheelers in stock a shoehorn O gauge layout it shall be!
I didn't have enough Peco points in stockto do it  but did have enough of my home made jobs so I have made the sidings out of code 100 once again to match those points. Recycled once again.

Ballasting is under way

Thursday, March 3, 2016

4108

The railway got a new loco today.
4108 was started some years before Bergs Hobbies mooted theirs. I used information from an early issue of the magazine and Ron Preston's book 'green diesels'.
It is made of styrene and brass mesh with Slaters wheels and a  Roxey gearbox. The sideframes are modified Col Shepherd.
Ted Freeman did the decals for me.




Friday, April 24, 2015

chocolate crackles on the move

The rake of private coal hoppers are on a trial run. A few things to tidy up but I couldn't wait to see them in operation. A more appropriate CHG (or two) and a 50 class perhaps one day.

 

regards
Bob

Thursday, April 2, 2015

A video update

Here is some video with visiting steam


Thursday, November 27, 2014

Visitors

Last week we had an opportunity to enjoy good company and visiting stock for 3 days.
The new catenary had only just been installed on a trial basis and the 'smoke' was taken out of the locos under some stanchions that had slipped down lower than spec.

Here we see a 38 being trialled on the mail.

Electrically the layout performed well. I have not cleaned the track in a long time, just an occasional brush to remove leaves and twigs and a scrape to remove bird poo. I put a few drops of powdered graphite on both main lines and that was it... no issues. Of course nothing will be perfect for visitors and some loose ballast jammed a point and two microswitches occasionally failed to do their job due to the points moving about. Both issues a result of a poor selection of glue in some areas to hold the ballast. Some screws inserted in the right place stopped the wandering points.

Good weather meant we were able to run late into the evening.

regards
 Bob

Friday, October 10, 2014

Traffic on line

Today sees Hunter Valley Mine's ex NSWGR 1803 and 72 shuffle a short train of assorted goods wagons past Seven Mile Mulga on their way down to the mine site.




Traffic is slowed by the construction of a full size over pass near the back fence.

regards
 Bob

Monday, September 15, 2014

A station at last.

Today under blue sky after the passing of a big black cloud the railmotor was able to deliver passengers to the new station. Still bereft of walkways or overhead bridge unfortunately for them .


The station building is an 'Old Dog'  plywood kit and the water column from their stable too.

regards
Bob

Saturday, August 2, 2014

A Visiting Loco

A 49 class turned up for a run this morning on my layout.
Rohan may now have to get a train to run behind it.:>)

Apparently it wont fit the loading gauge on Bolivia.


Tuesday, June 10, 2014

Mid-Year Update

The layout has been  progressing well. All the track is now laid.  The station sidings and relief road over near the access ramp are in and working.
The goods shed is installed sans some finer detail which can come later.
Testing has been in place to determine if radio/battery was necessary for the layout to operate to the electrical reliability standard I insist on. Result has been the removal of radio from all but one loco (only used as a banker for the access ramp). This loco has a current draw in excess of my systems capacity so it was not a hard decision to make.
I am currently using powdered graphite as a contact improver and it is working fine so far. Needed a little more than I use indoors for success. Trains seem to run fine even when the rails are covered in a heavy dew.

The track power v radio/battery decision just boils down to swapping some occasional loco wheel cleaning for charging batteries.The track has to be cleaned outdoors anyway. Given I like to just let the trains run, track power proved to be the best choice for me at the moment.
When I can use my DCC throttles, with a radio adaptor that allows me to use the decoder and batteries of my choice and comes with onboard charging from the track so the battery is more of an extended stay alive they will have won me.... no stalls/ failures to start AND no plugging locos into battery chargers and waiting, bliss!

Once the platform, station building and loading bank are built I might be able to concentrate on more rolling stock.

Thankfully I discovered that Urethane and the Australian sun are not good bedfellows before investing too much in rolling stock  made from that material. A warped set of coaches followed a previous experience with Gauge One wagons sagging. Back to wood and card for me until I move back indoors permanently.







Looking back, I could have agonised over having track that looked like NSWGR practice, building pointwork that matched only one wheel standard and counted rivets.  I would be a very long way from having an operating model railway if I had followed that path. Soon the layout will be 'complete' although  it can never be 'finished'.
Hindsight is wonderful; perhaps I could have avoided the 'flat board technology' look by gluing a 75mm layer of  styrofoam on top of the Villaboard sheet before laying the track. I think that would have provided enough glued surface to keep the foam from heading off into the neighbour's in a gale.

This is the last of the layouts on my list to build. It covers the 'O gauge layout big enough to run anything NSWGR' and the 'outdoor layout' in one swoop. When it comes time to abandon this layout and if  I am still able to build an indoor layout it is hard to say if I would continue with 7mm scale. Perhaps it will be time for a complete change of direction. An Sn3.5 layout running a variety of favourite trains or a British OO one would allow me more opportunities for doing the scenery and structures I enjoy building.... also my friends can once again bring their faulty HO equipment for me to diagnose the problem. :>)

regards
 Bob Comerford

Wednesday, March 12, 2014

The End of the Beginning



The layout has reached ‘The end of the beginning’ if I can misquote Churchill.
The loops are running, the access ramp and staging tracks have been installed and the pointwork  can be remotely controlled from the shed. This last item I felt was very necessary to recover trains in the event of a sudden shower.
Lighting has been installed to watch the trains at night as they pass by the garage window and near the crossing and ramp access to identify when trains are clear of points.
 




There now remains the scenicing and structures to be built. Locomotives and other rolling stock to be made. Some extra sidings are planned next to satisfy those who like to shuffle wagons about and perhaps some working signals.

The layout can accommodate British Fine and NMRA wheel standards and may be able to accommodate AMRA if it is insulated.  There is the capacity to run one dc consist as well as DCC. Battery electric will also be welcome ( I have two of my own under way).

Regards
 Bob

Thursday, January 30, 2014

Train Time at last

Finally the baseboard has been finished and two circuits laid.
Thanks are due to Dale Dawson, Rohan Fergusson and Steve  Jewell. 
Track is Peco code 124 with a few lengths of code 143 and some Atlas to make up the shortfall until I get some more packs of bullhead. Out in the real world of course the rail height matters little ( just fabricate some soldered matching sections). I chose to go the bullhead route because there was little in the way of experience I could call on in regards to use of the flat bottom under our conditions. The rail fixings are more substantial with the bullhead track.

Here is a shot of  my railmotor passing a steam hauled suburban set. The carriages are not my own work, they are some Ron Fox kits I assembled. I will have to take care not to use them when it is hot. My experiences with urethane in gauge one had wagons sagging with the heat.

A long way to go but at least the trains are now running. I might even squeeze another circuit in one day for use by those with clockwork and 3 rail. It might have to be stud contact given my aversion to solid third...... but then again it's outside so maybe I could live with it.
Already I see things I would do different. Halve the size of the layout to start.

Saturday, October 12, 2013

AustO

I have decided for the time being to only publish major changes on this blog.
To make connection with others easier I have started a new Yahoo group.
It is called "AustO"
While it initially assists two of us to keep in contact it is there for all to use who model Australian prototype in O scale, 1:48, 1:45, 1:43.5.............. you chose
3-rail, clockwork or DCC.... you chose
2foot, Cape, Stephenson or Irish gauges.... all are equal in my eye
Come along and show us your wares.... we'll take the rough and the smooth.
Bob

Tuesday, August 20, 2013

Chain drive

With what appears to be the world supply of POM chain drive components used for O gauge models having gone up the spout  I have been on the search for something to replace them.
I purchased some gears and chain from Technobots in the UK thanks to a suggestion by a member of  The Guild. While not up to the standard of the originals, beggars can't be.... well you know!

Here is the result of my ideas in this test bogie. Some deliberate and not so deliberate horrors introduced for the purposes of seeing how imperfection effects operation (I'm good at imperfection) . :>)
Two types of pickup being used... my usual wire method and flat brass strip ala some commercial offerings.




 
I have yet to add a tensioner for the chain.

Testing will commence when we have a layout to run it on.

Tuesday, June 18, 2013

Ventilating

Despite being rather one handed at the moment I decided to push the steel carriage project along a bit.
I was rather short of ventilators for the roof of the MHO and in keeping with the minimum cost idea of this O gauge layout I searched around the house for something suitable.
After ceasing to be part of the music scene some years ago I had stored away a large collection of guitar strings which I discovered recently had rusted away quite nicely ( note for next life.... store them in oil). After inserting a suitable nail in one of the brass turnings that are attached at one end of each string I decided this would do to represent a mushroom ventilator.


And so it came to pass that the MHO was ventilated.
p.s.
Santa heard my plea and arrived early with some wireless upgrades to my Digitrax UT4's and a duplex radio interface. Bliss!!